Risingbd Online Bangla News Portal

Dhaka     Saturday   04 April 2026

PM inaugurates 3rd Shitalakhya bridge

News Desk || risingbd.com

Published: 13:48, 10 October 2022   Update: 14:36, 10 October 2022
PM inaugurates 3rd Shitalakhya bridge

Prime Minister Sheikh Hasina has inaugurated the long awaited third Shitalakhya Bridge in Narayanganj.

She inaugurated the bridge, which is named after valiant Freedom Fighter AKM Nasim Osman, through a videoconferencing from her office on Monday (October 10) noon.

The 3rd Shitalakhya Bridge will connect Narayanganj city with Bandar upazila, boosting economy, easing the communication between Chattogram and southwestern districts via Padma Bridge.

The 1.29-kilometre bridge will enable Chattogram region-bound vehicles from the southwestern region and vice-versa to bypass Narayanganj city to avoid traffic congestion and save times, project director of the bridge Shoaib Ahmed.

Country’s economy will get boosted up significantly as it will reduce the travel time of vehicles bound to and from the southwestern part of the country, he said.

The people will get the maximum benefit from the Padma Bridge, once the new road network is built with the bridge, he also said.

The bridge will connect Madanganaj of Bandar upazila to the east with Syedpur of Narayanganj Sadar upazila to the west. Now motor-run boats are a key communication mode for the people on both sides of the river and other areas to cross it.

After opening of Shitalakhya Bridge, vehicles will not have to face severe traffic congestion in Panchabati BSCIC industrial area, Panchabati intersection, Chashara intersection, Singboard, Chattogram road in Narayanganj or Postogola and Shanir Akhra route in Dhaka, said Shoaib Ahmed. 

The vehicles will be able to bypass capital as well as Narayanganj city, he said, adding that moreover the pressure on the capital and Narayanganj city will also be reduced.

Though the project was approved in 2010 in the Ecnec, construction work started on January 28 in 2018.

The PD said the bridge construction is estimated at a cost of Tk608.56 crore as Tk263.36 crore came from Bangladesh government fund and Tk345.20 crore from Saudi Fund for Development (SFD).

The bridge with walkways has 38 spans - five in the river and 33 in the east and west ends. The width of the bridge along with walkways is 22.15 metres.

The Shitalakhya River separates the Bandar upazila and Sonargoan upazila from the district headquarter.

These two upazilas are not directly connected to the district headquarter by road. Kanchpur Bridge (Shitalakhya-1 Bridge) has to be used to go to the district headquarter from the two upazilas which requires nearly 30 km of travelling by road to cross just 3-5km distance through the river by boat.

Several thousands of people living in Bandar upazila cross the river Shitalakhya by boat every day for work in Narayangonj and Munshiganj.

Similarly, people from Narayangonj and Munshigonj also cross the river Shitalakhya by boat to come to Bandar or Sonargoan upazila.

The 3rd Shitalakhya Bridge at Bandar upazila, Narayanganj will establish direct road communication between Bandar upazila and the district head quarter.

Parvej/AI