Risingbd Online Bangla News Portal

Dhaka     Friday   26 April 2024

20-km long tailback on Tangail-Bangabandhu Bridge highway

News Desk || risingbd.com

Published: 12:22, 21 January 2021   Update: 15:18, 21 January 2021
20-km long tailback on Tangail-Bangabandhu Bridge highway

A 20-km long tailback has been created on Tangail-Bangabandhu Bridge highway as toll collection was suspended in several phases due to thick fog. 

As a result, several hundred of vehicles got stuck on both lanes of the highway, leaving passengers of the route in immense suffering.

Md Kamal Hossain, in-charge of Elenga Highway Police Outpost, confirmed the news.

“The long tailback has been created on Tangail-Bangabandhu Bridge highway as toll collection was suspended in several phases due to dense fog. Vehicular movement will become normal once the fog disappears,” he said.

Kawsar/Bulaki/AI